Project Profile

Equipment Shelter Construction – Pinal Peak, AZ

Client: Antenna Sites Inc. | Builder: Miko, LLC

Miko, LLC constructed a remote communications equipment shelter on Pinal Peak, including structural, roofing, and finish components, specifically tailored to meet technical needs in an off-grid, mountainous environment.

Scope Highlights:

  • Permit acquisition and full-site excavation for stem walls and footings
  • Installation of monolithic slab foundation and generator pad with rebar reinforcement
  • Masonry construction of 8x8x16 CMU block walls
  • Roof framing, gable end siding, and fascia installation
  • Peel-and-stick metal roof underlayment (roof install by others)
  • Structural steel: Revised steel post supports and new ice bridge supports
  • Door installation (4070 hollow core metal door) and small roof cover at entry
  • Full exterior/interior painting using Sherwin-Williams systems
  • Final cleanup, site mobilization, and material haul-off

This project required logistical precision, durable materials, and clear coordination with site-specific constraints to deliver a secure and functional shelter for mission-critical infrastructure.